A place to record some research links doing a 4-8-4 MCIP upgrade refresh, from 4 x A400 nodes, to 4 x A800 nodes.
System Refresh Documentation
We start with:
1) Start here: Choose between controller upgrade, system refresh, or expansion
We're doing a system refresh (which has similarities to expansion). So:
2) Choosing a system refresh method
Our method: Expand the MetroCluster configuration and then remove the old nodes.
3) Refresh a four-node or an eight-node MetroCluster IP configuration (ONTAP 9.8 and later)
The above will be the main procedure we'll be following.
Replacing the MCIP Switches
Note: I don't think the below is a great document.
Replace an IP switch or change the use of existing MetroCluster IP switches
We will need an RCF suitable for having 4-nodes of A400 and 4-nodes of A800 existing in the MetroCluster at the same time (RCF for an 8-node A800 should be fine.)
We will need a port mapping plan from old layout (A400 to old switch) to new layout (A400 and with A800).
We will need to validate all relevant softwares.
Suggested Technical Planning Document Headings
- Project Overview
- Background
- Key Dates
- Current Infrastructure
- New Hardware
- Sales Orders
- Software
- Software versions
- RCFs
- Existing BES-53248 RCF
- New Cisco NX9336 RCF
- Hardware
- Cabinet Layouts
- Cabling
- Existing BES-53248 Configuration
- New Cisco NX9336 Configuration
- High-Level Steps
- Preparation
- Replace BES-53248 switches with Cisco NX9336
- Add A800 nodes to MCIP (make it 8 nodes)
- Migration (vol moves)
- Remove A400 nodes from MCIP (make it 4 nodes)
- Low-Level Steps
- TBC
- APPENDIX
- References
- Q&A