9.10.1 ARL System Controller Replace Start Verification Commands

This output is taken from a SIMBOX.
cluster1::*> system controller replace start -simulate true -nodes cluster1-01,cluster1-02

Warning:

1. Current ONTAP version is ...

2. Verify that NVMEM or NVRAM batteries of the new nodes are charged, and charge them if they are not. You need to physically check the new nodes to see if the NVMEM or NVRAM batteries are charged. You can check the battery status either by connecting to a serial console or using SSH, logging into the Service Processor (SP) or Baseboard Management Controller (BMC) for your system, and use the system sensors to see if the battery has a sufficient charge.

Attention: Do not try to clear the NVRAM contents. If there is a need to clear the contents of NVRAM, contact NetApp technical support.

3. If a controller was previously part of a different cluster, run wipeconfig before using it as the replacement controller.

4. Note: This is not a Metrocluster configuration. Controller replacement supports only ARL based procedure.

Do you want to continue? {y|n}: y
Controller replacement operation: Prechecks in progress..
Controller replacement operation has been paused for user intervention.
Run the following commands from either node of the selected HA pair and save the output for the nodes: cluster1-01 and cluster1-02

vserver services name-service dns show

network interface show -curr-node <nodename> -role cluster,intercluster,node-mgmt,cluster-mgmt,data

network port show -node <nodename> -type physical

service-processor show -node * -instance

network fcp adapter show -node <nodename>

network port ifgrp show

system node show -instance -node <nodename>

run -node <nodename> sysconfig

storage aggregate show -node <nodename>

volume show -node <nodename>

storage array config show -switch

system license show -owner *

storage encryption disk show

security key-manager backup show

security key-manager external show

security key-manager external show-status

network port reachability show -detail

Verify that all ports are reachable (must report "ok" reachability status) using the command "network port reachability show -detail" before it is safe to move         on.

After collecting the information, resume the operation using "system controller replace resume" command.

Current model is SIMBOX
The supported replacement models for your system are: SIMBOX.

Comments